Client
Project Description
Technopath
Construction of New Industrial Unit and Refurbishments and Fit out of Existing Industrials Units.
Project Duration
16 Weeks
Work Included
-
The Construction of new industrial facility measuring over 1000m2 and to adjoin to existing unit existing building.
-
,Works included pile foundations structural steel frame installation of mezzanine floor, all mechanical and electrical installations.
-
Fit out Technopath Unit 1 which composed of a complete strip out of the old unit and the redesign and reconfiguration for an office layout.
-
Works included the installation of a new mezzanine floor. Plumbing and rewiring of entire unit.
-
All walls and existing columns were repainted.
-
New doors and windows were fitted.
-
It must be noted that the entire projects were carried out in a live working environment with no reportable health and safety issue occurring.