Client
Project Description

Technopath

Construction of New Industrial Unit and Refurbishments and Fit out of Existing Industrials Units.

Project Duration

16 Weeks

Work Included
  • The Construction of new industrial facility measuring over 1000m2 and to adjoin to existing unit existing building.

  • ,Works included pile foundations structural steel frame installation of mezzanine floor, all mechanical and electrical installations.

  • Fit out Technopath Unit 1 which composed of a complete strip out of the old unit and the redesign and reconfiguration for an office layout.

  • Works included the installation of a new mezzanine floor. Plumbing and rewiring of entire unit.

  • All walls and existing columns were repainted.

  • New doors and windows were fitted.

  • It must be noted that the entire projects were carried out in a live working environment with no reportable health and safety issue occurring.